Project · complete electrical installation · Prague + Central Bohemia

Electrical installation from the distribution board to the last socket

We handle entire buildings, not individual sockets. New-builds for detached houses, complete rewiring during renovations and installations for businesses, with a fixed budget, in accordance with ČSN standards and including an initial inspection in the price.

Installed consumer unit with circuit breakers and colour-coded conductors
ProjectElectrical installations for detached houses
GradeImplementation
Inspection2026 · compliant
Response to inquiry within 24 hours Budget fixed after inspection Work in accordance with ČSN Initial inspection included in the job price

Scope of work · three circuits

What we install

We manage projects as a whole: from design and routing through rough-in installation to final assembly, distribution board and inspection. One responsible master electrician from start to finish.

Order process · five stages

How an order proceeds

Node 01

Enquiry and site inspection

Contact us via the form or by phone. We will arrange an inspection within 24 hours, for new builds, the project documentation is sufficient.

Node 02

Fixed-price quotation

Itemised budget broken down by individual circuits and rooms. The offer is binding; any additional work requires prior approval.

Node 03

Rough installation

Routing, boxes, pulling conductors. We coordinate with bricklayers, drywallers and heating engineers to ensure the trades follow on without gaps.

Node 04

Completion and distribution board

Installation of sockets, switches and light fittings, wiring and labelling of the distribution board. Every circuit is marked so that another electrician can understand it even twenty years later.

Node 05

Inspection and handover

The initial inspection report is included in the price. We will hand over the as-built documentation and the distribution board schematic.

Budget · indicative rates 2026

Indicative prices

We will determine the exact price after an inspection or based on project documentation. However, these rates will give you a realistic idea before we meet.

ItemScopePrice
Electrical installation for a new detached housecomplete high-voltage and low-voltage installationfrom 1 550 Kč/m²
Apartment electrical installation renovationnew distribution lines, circuits, distribution boardfrom 1 950 Kč/m²
Installation pointsocket / switch / outletfrom 950 Kč
Distribution board for a detached housematerials + wiring + circuit descriptionfrom 28 000 Kč
Initial inspectionfor complete ordersincluded in the price

Prices are indicative, excluding VAT, and depend on the scope, materials, and condition of the property. For complete projects (new builds, full refurbishments), the price is always fixed according to the approved budget.

Why elektromistri.cz

What we stand for

Fixed budget

Itemised offer by circuits. No "we'll see": additional work only after prior approval.

One craftsman

A single responsible person manages the job from inspection to final check. You know who you are calling.

CSN standards and inspections

Installation in accordance with current standards, initial inspection report and as-built documentation included in the price.

Clean workmanship

We cut grooves with extraction, protect floors and clean up afterwards. Even on occupied sites.

Frequently Asked Questions

What you are asking about

How much does a complete electrical installation for a 2+1 apartment cost?

For an apartment of around 55 m², budget approximately from 110 000 Kč excluding VAT for a complete replacement of the wiring including the distribution board and inspection. The exact price will be determined after an on-site survey: the number of points, wall material and scope of low-voltage work are decisive factors.

How long does an electrical installation renovation take?

Rough installation in a 2+1 apartment typically takes 4-6 working days, with final completion after painting requiring another 2-3 days. For new-build detached houses, we follow the construction schedule.

I have old aluminium distribution pipes. Do I need to replace them?

Aluminium from the 60s to 80s is at the end of its service life, joints are loosening and overheating is a risk. If you are planning a renovation, replacing the distribution lines is the first thing we recommend. We will assess the condition during a free inspection.

Are you preparing the house for photovoltaics and a wallbox?

Yes. For new builds we standardly design a reserve in the distribution board, cable routes for PV systems and an outlet for a wallbox, subsequent retrofits are always more expensive than preparation during construction.

Do you take on smaller jobs too?

Our work covers entire buildings and complete refurbishments. We take on smaller repairs depending on capacity, write to us about your issue and we will let you know if we can attend to you.

In which areas do you operate?

Praha and Central Bohemia. For larger projects (new builds, commercial properties), we can arrange work anywhere in the country.

Enquiry · we respond within 24 h

Describe your building to us

Tell us what you are building or renovating, the approximate area and when you would like to start. We will get back to you within 24 hours to arrange an inspection or request project documentation.

277 278 914

Mon - Fri 7:00-17:00 · [email protected]

By submitting, you consent to the processing of your contact details for the purpose of handling your enquiry. We do not store these details in a database; they will be forwarded by email to the person handling the enquiry.